Original Article
Appraisal of Optimum Economic Life for Farm Tractor: A Case Study
Year: 2019 | Month: March | Volume 64 | Issue 1
1.Ajibade, A.D., Odusina, M.T., Rafiu, A.A., Ayarinde, A.W., Adeleke, B.S. & Babarinde, S.N. 2014. The use of replacement model to determine the appropriate time to replace a deteriorating industrial equipment. IOSR Journal of Mathematics, 10(2): 9–13
View at Google Scholar2.Amiens, E.O., Oisamoje, M.D. & Inegbenebor, A.U. 2015. A dynamic programming approach to replacement of transport vehicles in Benin City, Nigeria. British Journal of Mathematics & Computer Science, 6(3): 204–214
View at Google Scholar3.Anderson, A.W. 1988, Factors affecting machinery costs in grain production. ASAE paper No. 88-1057
View at Google Scholar4.ASAE Standards EP496. Agricultural Machinery Management Engineering Practice. 2006.
View at Google Scholar5.Aven, T. 1992. Reliability and Risk Analysis. Elsevier Science Publishers Ltd..
View at Google Scholar6.Belchet, E.F. 2008. Afirst passage time problem in system replacement. Proceedings of the first international conference on applied operational research. Tabir Institute for Operational Research, System Design and Financial Services, 1: 222–229
View at Google Scholar7.Bukhari, S.B., Baloch, J.M. & Naqvi, S.H. 1988. “Cost of operating tractors on Quetta farm, Pakistan”, AMA, 19(1): 14-19.
View at Google Scholar8.Christer, A. & Goodbody, W. 1980. Equipment replacement in an unsteady economy. Journal of the Operational Research Society, 31(6): 497–506.
View at Google Scholar9.Dauda, A. & Ashami, B. 2000. “Agricultural machinery utilization in Borno State”, Nigerian Journal of Engineering Management, 1(4): 23-7
View at Google Scholar10.Dohi, T., Ashioka, A., Kaio, N. & Osaki, S. 2006. Statistical estimation algorithms for repairs-time limit replacement scheduling under earning criteria. Computers and Mathematics with Applications, 51: 345–356.
View at Google Scholar11.Eilon, S., King, J. & Hutchinson, D. 1966. A study in equipment replacement. Operational Research Quarterly, 17(1): 59–71.
View at Google Scholar12.Ekeocha, R.J.O., Odukwe, A.O. & Aguwambaa, U. J. C. 2011. Machinery replacement problems model. World Journal of Engineering and Pure and Applied Science, 1(3): 81.
View at Google Scholar13.Hunt, D.R. 1974. Eight Years of Cost Monitoring, Working Paper No. 74-1544, ASAE, St Joseph,MI.
View at Google Scholar14.Hunt, D.R. 1977. Farm Power and Machinery Management: Laboratory Manual and Workbook, 7th ed., Iowa State University Press, Ames, IA.
View at Google Scholar15.Hunt, D.R. Farm Power and Machinery Management, Tenth Edition, Iowa State University Press, Ames. USA. 2001
View at Google Scholar16.Igbeka, J.C. 1986. “Economic evaluation of tillage operations in some mechanized farms in Nigeria”, AMA, 17(2): 17-22
View at Google Scholar17.Jin, D. & Kite-Powell, H.L. 2000. Optimal fleet utilization and replacement. Transportation Research Part E36, 3–20.
View at Google Scholar18.Morris, J. 1998. Estimation of tractor repair and maintenance costs. Journal of Agricultural Engineering Research, 41(3): 191-200.
View at Google Scholar19.Offiong, A., Akpan, W.A. & Ufot, E. 2013. Development of vehicle replacement programme for a road transport company. International Journal of Applied Science and Technology, 3(2): 31–35.
View at Google Scholar20.Perry, G.M., Bayaner A. & Nixon C.J. 1990. The effect of usage and size on tractor depreciation. Am. J. Agr. Econ., 72(2): 317-325.
View at Google Scholar